Tobin Bridge is closed by truck crash.
September 9, 1973
An overloaded gravel truck slams into a girder of the Tobin Bridge. The driver is killed, 200 feet of the upper deck of the bridge collapses, and the bridge is closed for two months while the damage is repaired.
Sources
- Boston Globe